Wednesday, February 18 we had an appointment later in the day with management to finalize the NAO, 2009, the objective of the meeting was to determine the objectives to reach an additional € 200 to € 400 bonus. This meeting was canceled at any last time by management (there was a fire at Pithiviers), following the cancellation of the proposed direction we find ourselves the next day February 19, 2009 meeting after the end of the CEC, and although again the meeting was canceled for the same reasons (it starts to do a lot we do not wind vanes).
In summary we do not have the 400 € in pockets as to touch the end of June it should first sign an incentive agreement with criteria realistic and achievable social partners and for us in the wake define criteria that could trigger the 200 € complementary.
We are in the full fuzzy, and have not received the direction of Proposed dates for debate on issues, unless that consideration is that we are at the end of NAO 2009. We
back to you as soon as possible and will do the maxium you say more about the sequel in 2009 to 3M "Do not touch the grisbi" (film J.gabin with J. Becker)
cfdt-3m@laposte.net
0 comments:
Post a Comment